Planning to pack and load unit equipment for movement is an important unit responsibility. The UMO identifies the actual space, weight, packaging material, and external transport requirements needed for deployment. If done properly, this planning will save the unit time and prevent delays. Units should rehearse packing and loading procedures. 3- 2. Unit personnel consolidate all TOE, MTOE, CTA equipment, and basic loads of supplies at loading sites. They ensure that all required packing material, supplies, and MHE are staged. The UMO will assemble and brief all appropriate unit personnel on the following packing and loading requirements:
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |